Air Force

As Per the Air Force Instruction 32-1067, Civil Engineering Water and Fuel Systems (4 February 2015) (http://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-1067/afi32-1067.pdf), requirement to conduct a cross-connection survey every five (5) years. Specific task objectives are as follows:

  • Conduct a cross-connection control survey of all water-using facilities, except base housing.
  • Update the cross-connection inventory with data collected during the field survey.
  • Develop a cross-connection control survey memorandum report that includes findings from the survey and prioritized recommendations for program improvement along with associated cost estimates.