Fire Safety Inspection and Fire Permits
Atlanta Code of Ordinances Ch. 78, Art. III, Sec. 78-56 and 78-57 (fire prevention code adopted); Georgia State Minimum Fire Safety Standards
Per occupancy and permit
Atlanta Fire Rescue Community Risk Reduction / Fire Inspections Section inspects existing commercial buildings for fire and life safety hazards; a $25 processing fee is added to every inspection request.
When: Inspections on request, at Certificate of Occupancy, and as required by the Fire Marshal; a fire permit may be required based on inspection results
Applies to: Commercial and multi-family occupancies inside the City of Atlanta
Authority: Atlanta Fire Rescue Department, Office of the Fire Marshal (404-546-7000)
Read the rule →
Commercial Buildings Energy Efficiency Ordinance — benchmarking
Atlanta Ordinance 15-O-1101; Atlanta Code Part III, Ch. 8, Art. J, Sec. 8-2222 to 8-2235
Annual
Owners of covered non-city property benchmark energy (and water) use annually; the city publishes the data each September.
When: June 1, 2026 per Sec. 8-2222 (prior calendar year, via ENERGY STAR Portfolio Manager); the city program site currently lists July 1, 2026 as the 2026 compliance date
Applies to: Non-city property in Georgia property classes C, E, P or V with buildings totaling more than 50,000 gross sq ft, and since January 1, 2017 more than 25,000 gross sq ft; condominiums under one board over 50,000 sq ft
Authority: City of Atlanta Mayor's Office of Sustainability and Resilience (buildingefficiency@atlantaga.gov)
If it slips: Written warning for a first violation; if benchmarking is not reported within 30 days of the warning, a fine of $1,000 upon conviction, with each year of non-compliance a separate $1,000 offense (Sec. 8-2226 penalties).
Read the rule →
Commercial Buildings Energy Efficiency Ordinance — energy audit
Atlanta Code Sec. 8-2227 and 8-2228 (Ordinance 15-O-1101)
Every 10 years
Summary audit report by a qualified energy auditor (registered architect, professional engineer or certified energy manager with 2+ years of auditing experience, or equivalent certification). Buildings under 10 years old or recently commissioned may defer.
When: Every 10 years; due December 31 of the calendar year whose last digit matches the last digit of the property's Atlanta Building ID number (first cycle began 2016)
Applies to: Covered properties over 25,000 gross sq ft (see benchmarking entry)
Authority: City of Atlanta Mayor's Office of Sustainability and Resilience
If it slips: Written warning; if the summary audit report is not filed within 90 days of the warning, a fine of $1,000 upon conviction, each year a separate offense.
Read the rule →
Elevator and Escalator Inspection
O.C.G.A. §8-2-100 et seq. (§8-2-102 inspections); Ga. Comp. R. & Regs. 120-3-25
Annual
Power passenger and freight elevators, escalators, manlifts, moving walks, hand elevators and dumbwaiters are inspected each 12 months; the signed Certificate of Inspection is posted in the cab and replaced at each inspection. Inspection reports are filed within 10 days with the state or local enforcement authority.
When: Once during each 12-month period (every 6 months in certain facilities under Title 32, Ch. 9, Art. 2)
Applies to: All elevators and related equipment in Georgia except private-residence elevators (initial inspection only)
Authority: Georgia Office of the Commissioner of Insurance and Safety Fire, Engineering Division (or a local enforcement authority with an approved program)
If it slips: The enforcement authority may require the owner or lessee to discontinue use of unsafe equipment (§8-2-102).
Read the rule →
Boiler and Pressure Vessel Permit (certificate) Inspection
O.C.G.A. Title 25, Ch. 15, Art. 2 (§25-15-23, §25-15-26); Ga. Comp. R. & Regs. 120-3-26-.08
Annual / biennial / triennial by class
A valid inspection certificate is required to operate a boiler or pressure vessel (§25-15-26). Internal-inspection intervals may be extended to 18 months (black liquor) or 24 months (power boilers) with Commissioner approval.
When: Power boilers and high-pressure high-temperature water boilers: annually (internal). Low-pressure steam, hot water heating and hot water supply boilers: biennially. Pressure vessels: every 3 years.
Applies to: Boilers and pressure vessels in Georgia other than those exempted by the Act
Authority: Georgia Office of the Commissioner of Insurance and Safety Fire, Boiler and Pressure Vessel Section
Read the rule →
Backflow Prevention Assembly Testing
Atlanta Code of Ordinances Ch. 154, Art. III, Sec. 154-66 (Cross-connection control / backflow prevention program)
Periodic (program-set)
All commercial water customers, and residential customers with irrigation systems or certain home-based businesses, must maintain and test backflow prevention assemblies.
When: Periodic testing by a registered backflow assembly tester; test reports filed with the Department of Watershed Management via SwiftComply. Interval is set by the program (the authority page does not print it; industry practice is annual).
Applies to: Commercial water customers of the City of Atlanta and specified residential customers
Authority: Atlanta Department of Watershed Management, Environmental Compliance Section
Read the rule →
3 of these carry a fixed date; the rest run on a cycle tied to your building.
Dates and cycles are drawn from Atlanta jurisdiction data and were current when this page was generated.